C635Q Newbridge Road Reconstruction VendorPanel Public Tenders
https://www.vendorpanel.com.au/tsi.axd?id=4f2580dcd18544e68676ab6451f4ce11s452200s50c818bb80c044cab1c37a23ba39eee8s1554
Tender Details : 1. Specification
1.1 Introduction
Council is requesting quotations from suitably qualified contractors for Newbridge Road reconstruction
1.2 Scope of works
Location
Newbridge Road, Woodstock CH 7.700.00 to CH 9.700.00
Longitude 143.99690 Latitude -36.77167
Total works: - 16,000 m2
Stage 1 Pulverisation – 16,000m2 at 100mm depth
Stage 2 Stabilisation - 16,000m2 at 150mm depth with 3% lime
Council to supply grader, water truck, rollers & traffic management.
2. Project Specific Notes
Works to be completed in two visits, completing 8,000m2 each visit.
Each visit is to be confirmed with the Superintendents Representative 5 working days before works commence
Works to be commenced during first week of May, 2025
Issued by : Loddon Shire Council
Closing Date : 02/Apr/2025 12:00 PM (UTC+10:00) Canberra, Melbourne, Sydney time
Reference number : VP452200
Contact person : Jess Vickers Email: jvickers@loddon.vic.gov.au Tel: 5494 1288
Tender categories : Construction & Operation
Specification Docs : 2
Construction & Operation
PublishDate
11 Mar 2025 13:00:00
ClosingDate
02 Apr 2025 01:00:00
Name
C635Q Newbridge Road Reconstruction
Business Name
Loddon Shire Council
Buyers Reference
LSC2025-5
Opens
Wednesday 12 March 2025 (AUS Eastern Standard Time)
Closes
Wednesday 02 April 2025 12:00 PM (AUS Eastern Standard Time)
Supplier Query Cutoff
Wednesday 02 April 2025 12:00 PM (AUS Eastern Daylight Time)
Expected Decision
Wednesday 09 April 2025 (AUS Eastern Standard Time)
Location
41 High StWedderburn, Victoria 3518Australia
Website
http://www.loddon.vic.gov.au/
Business Info
The Shire of Loddon is a local government area in Victoria, Australia, located in the northern part of the state. It covers an area of 6,696 square kilometres (2,585 sq mi) and in June 2018 had a population of 7,513.It includes the towns of Inglewood, Boort, Serpentine, Pyramid Hill and Wedderburn. It was formed in 1995 from the amalgamation of the Shire of East Loddon, Shire of Gordon, Shire of Korong, and parts of the Rural City of Marong, Shire of Bet Bet, Shire of Maldon and Shire of Tullaroop.
Details
1. Specification1.1 IntroductionCouncil is requesting quotations from suitably qualified contractors for Newbridge Road reconstruction1.2 Scope of worksLocationNewbridge Road, Woodstock CH 7.700.00 to CH 9.700.00Longitude 143.99690 Latitude -36.77167Total works: - 16,000 m2Stage 1 Pulverisation – 16,000m2 at 100mm depthStage 2 Stabilisation - 16,000m2 at 150mm depth with 3% limeCouncil to supply grader, water truck, rollers & traffic management. 2. Project Specific NotesWorks to be completed in two visits, completing 8,000m2 each visit.Each visit is to be confirmed with the Superintendents Representative 5 working days before works commenceWorks to be commenced during first week of May, 2025
Lists
Construction & Operation
Categories
Construction & Operation1: Pavement Stabilisation Services & Materials2: Road Building Products & Maintenance & Services
Locations
Victoria1: Barwon2: Central Highlands3: East Gippsland4: Gippsland5: Goulburn6: Loddon7: Mallee8: Melbourne9: Ovens-Murray10: Western District11: WimmeraAll Regions of Service locations are within Australia.
Information Requested
None...